Buying a used line starts with an investment brief. Record production requirements, inspect the candidates and separate the asking price from installation and recommissioning costs.
- What evidence supports the advertised output?
- Which dismantling, transport and installation costs are outside the quotation?
Build a used-line investment shortlist
Separate mandatory requirements from preferences in the investment brief. Product, format range, target output and available space should decide whether a candidate enters the shortlist. Keep unsupported specifications as open questions instead of assuming that every listing fits.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.