shortlisting, due diligence and total acquisition cost
Buyer guides
Buying a used line starts with an investment brief. Record production requirements, inspect the candidates and separate the asking price from installation and recommissioning costs.
shortlisting, due diligence and total acquisition cost
Buyer guides
Compare used bottling line quotations on the same scope
Create an offer comparison showing machinery, format parts, dismantling, transport and commissioning responsibilities before committing.
Read guide →Compare two line offers with different included conveyors
Compare conveyor scope in two used bottling-line offers using one layout and explicit allowance for missing modules.
Read guide →Negotiate format-part verification before a line deposit
Negotiate proof of included format parts before a line deposit using machine references, photos and open requirements.
Read guide →Set buyer conditions for inspecting a line after a production stop
Set buyer inspection conditions after a bottling line stops, using isolated checks, dated operating records and deferred trial terms.
Read guide →