Two offers for a used bottling line can describe different purchases even when the headline speed is similar. One may include conveyors and tooling; another may cover only the principal machines. Compare the delivery scope before ranking prices. A written offer matrix lets the buyer identify missing items, assign responsibility and request an updated quotation on a consistent basis.
Create a physical equipment schedule
Give every machine and ancillary item a row. Record manufacturer, model, reference, location and the document supporting its inclusion. Add conveyors, electrical cabinets, cap feeding, coding equipment and inspection devices where relevant. Mark each row included, excluded, optional or awaiting confirmation. Photographs help identify an item but should be reconciled against the seller’s written supply list.
Price the format actually required
Add the bottle drawings, closures, labels, case patterns and target output to the request for quotation. Ask which change parts are already included for those formats and which require a separate offer. Keep a proposed capability separate from a demonstrated capability. Record the company responsible for assessing modifications so an unexplained allowance does not become an assumed completed engineering solution.
Separate transaction and relocation costs
Create distinct rows for inspection, disconnection, dismantling, preservation, packing, lifting, loading, freight, delivery access, reassembly and commissioning. Record the named responsible party and the agreed delivery terms from the offer. Add destination utilities and integration work as separate project items. Use quoted or verified figures; leave unknown costs visible rather than filling them with a generic percentage.
Resolve exclusions before choosing
Review the largest unknowns with the technical and purchasing teams. Ask each supplier for a revised offer showing the agreed configuration, exclusions, test arrangements and handover documents. Preserve the original offer and record the revision date. This produces a comparable decision record without implying that the cheapest headline price or the newest advertised machine is automatically the best fit for the production brief.
Buying checklist
- List each machine and ancillary item explicitly.
- Attach the required format and output assumptions.
- Assign dismantling, loading and commissioning responsibility.
- Resolve material unknowns in a revised written offer.