Buying a used line starts with an investment brief. Record production requirements, inspect the candidates and separate the asking price from installation and recommissioning costs.
- What evidence supports the advertised output?
- Which dismantling, transport and installation costs are outside the quotation?
Compare acquisition cost at destination
Ask the quotation to distinguish machinery price from dismantling, packing, loading and transport. Add the work needed at your site, including utilities and recommissioning. Use confirmed amounts and clearly marked allowances so the budget remains traceable.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.