Ask what condition the stopped line will be in during inspection. Record which observations the site permits and which production claims are supported by an earlier test. List what would need to be demonstrated after a later approved restart.
Assign proof to the available condition
| Claim | Proof available in its current condition | Next decision |
|---|---|---|
| Equipment and tooling are present | Nameplates, visible inventory and matching drawings | Confirm exact included assets |
| A format ran at the quoted rate | Dated production record with package and measurement boundary | Review history and agree whether to repeat |
| A transfer works in the buying configuration | Current visible interface and previous operating evidence | Defer function to authorized runtime if needed |
| Release of unresolved claim | Buyer and seller conditions in writing | Assign date, owner and agreed result |
If earlier evidence uses a different cap or package, preserve it with that limitation. Decide which unknowns affect the offer and which can move into a later acceptance test.
Use the evidence for a buying decision guide to agree the checks that matter before committing.