One seller may quote an entire stretch from filler to labeller while the other includes only the motorized conveying section. Mark the same start and finish points on both quotations before comparing totals. Record whether guides, drives, supports, controls and format components are included.
Compare the same physical route
Number each section on the proposed layout. Ask the seller to identify included and omitted parts with drawings and photos. Where a quote excludes an item, record the cost or leave a named open allowance. Confirm which party will supply and verify each interface.
| Item | Offer A | Offer B |
|---|---|---|
| Measured length and endpoints | ___ | ___ |
| Included guides, drives and supports | ___ | ___ |
| Controls and transfer components | ___ | ___ |
| Open work, verified cost and owner | ___ | ___ |
A €12,000 conveyor allowance can change the order of two offers only if it covers the same supply and handover. Price the omitted drive, supports, guards and controls to the named interface. If the existing filler supplies the start signal, ask who wires it and proves that the transfer stops and restarts correctly during acceptance.
Use the buyer worksheet to compare complete quotations
Review your two conveyor scopes
Share both lists, the layout and the point where the offers stop matching.